The seven chronological result points explained
The modern time-release engine reports seven chronological result points during a drop. These are timing checkpoints across the release window that let you judge the best moment to fire your EPP create commands.
Because Nominet's time-release process (introduced September 2022) releases names on a schedule rather than in a single free-for-all, precise timing matters more than raw speed. The seven points give you a structured read on how the release is progressing so you can decide when a create is most likely to land, rather than blindly hammering the socket.
Used together with the on-screen latency figure, the result points turn timing from guesswork into something you can observe and tune.

0 comments
Sign in with your TDesk account to comment.